How many balusters for a 6 ft railing section?

Short answer

A 6 ft railing section (68½ inches between 4×4 posts) takes 13 balusters of 1½ inch 2×2 stock, spaced an even 3-1/2 inches apart — 5 inches on center, with the first baluster center 4-1/4 inches from the post.

How to work it out

  1. (68-1/2 in − 3-3/4 in) ÷ (1-1/2 in + 3-3/4 in) = 12.33 → round up to 13 balusters
  2. (68-1/2 in − 13 × 1-1/2 in) ÷ 14 gaps = 3-1/2 in (3.5 in)

Six-foot post spacing with 4×4s is the classic deck railing layout, and it happens to divide perfectly: thirteen 2×2s leave fourteen gaps of exactly 3½ in. Rip one spacer block at 3½ in and the whole section goes up without a tape.

Measure between your actual posts first — a post set ¼ in out of line changes the gap on that section, and it is easier to rerun the numbers than to fudge the last gap.

Adjust for your project

On a stair, pick the stair option and measure along the sloped rail.
in
Level: 6 ft centers with 4×4 posts = 68½ in. Stair: measure along the rail, post face to post face.
in
2×2 = 1½ in; round metal ≈ ¾ in
in
US: keep deck gaps under 4 in; on the open side of a stair the IRC allows up to 4-3/8 in. UK: under 100 mm.
More options: Layout
An odd count puts a baluster in the middle, an even count a gap. Matching every section looks tidier.
Balusters per section13 balusters
Gap (cut your spacer to this)3-1/2 in
Exact gap (decimal)
3.5 in
Middle of the section
A baluster, centered
Balusters for all sections
13 balusters
Center-to-center spacing
5 in
Post face to first baluster center
4-1/4 in
Screws (2 top, 2 bottom each)
52 screws
  • Balusters and 2×2s are not perfectly uniform. Measure a few, and cut a spacer block to the exact gap instead of measuring each one.
Check your codeCode limits vary by jurisdiction — confirm with your building department before you cut or build. (IRC R312)

For this job · affiliate link
Cordless drill/driver kit52 screws, each within an inch of a baluster end — pre-drill every one or the 2×2s split. A drill and a driver (or two batteries) makes it one pass.
View on Amazon (opens in a new tab)

Balusters for a 6 ft section, by baluster width

Balusters for a 6 ft section, by baluster width
Baluster widthBalusters per sectionExact gap (decimal)Center-to-center spacing
0.75 in15 balusters3.58 in4-5/16 in
1 in14 balusters3.63 in4-5/8 in
1.25 in13 balusters3.73 in5 in
1.5 in13 balusters3.5 in5 in

What to know about a 6 ft railing section

The 3½ in gap clears the rule in IRC R312.1.3 that a 4 in sphere must not pass through any opening in a guard, with ½ in to spare for boards that shrink or bow. That margin matters with pressure-treated 2×2s bought wet, which can narrow as they dry. A guard is required where the deck surface is more than 30 in above the grade within 36 in of its edge (R312.1.1), and its top must be at least 36 in above the deck (R312.1.2).

With an exact 3½ in gap there is no rounding to spread around: set the spacer against the post, fasten a baluster, move the spacer, repeat. Check plumb with a level every three or four balusters. Across thirteen pieces, a small lean adds up faster than any gap error, and you will see it from the yard.

For a whole deck, count sections rather than feet. Six 6 ft sections take 78 balusters and 312 screws at two per end, before any spares for split or badly bowed pieces. The screws are close to the ends of each 2×2, so pre-drill.

Longer post spacing is on How many balusters for an 8 ft railing section. If the railing continues down the stair, the open side of a stair allows a 4-3/8 in sphere instead; How many steps for a 4 ft deck is the height at which the stair needs that guard.

What you’ll need

As an Amazon Associate we earn from qualifying purchases. Links to products are affiliate links — they cost you nothing extra and help keep these calculators free.

Frequently asked questions

How many 2×2 balusters for six 6 ft railing sections?

78 balusters in all — 13 balusters per section — and 312 screws at two per end.

How many balusters for a 6 ft stair railing section?

With 7½ inch steps and a 10½ inch run the rail slopes about 35.5°, so 68½ inches measured along the rail is only 55-3/4 in (4 ft 7-3/4 in) level. That takes 10 balusters of 1½ inch stock with gaps a hair over 3-11/16 in, marked 6-3/8 in apart along the rail.

How many ¾ in metal balusters for a 6 ft railing section?

15 balusters, with gaps of a hair over 3-9/16 inches (3.58 in) and 4-5/16 in on center. Follow the maker’s spacing if the rails come pre-drilled.

Sources